佳能C2020出E000020-0060
更新时间:2026/11/14 13:47:04,view:223苏州佳能2020打印机售后服务中心客服热线69616769,苏州佳能打印机售后维修电话,佳能打印机售后网点,佳能2020插入废粉收集容器,c维修代码E000002-0006,报代码E020-1160是什么问题,ir错误代码E355,打印机维修密码,打印机废粉怎么处理,c复印机不能识别黄色粉盒怎么处理,c,使用长时间,夹纸,跳e805,4710报e002,E0000090000,CANONire100,复印机清除用户名,c客户支持中心,显示e805,2020维修视频2026/10/22
佳能C2020出E000020-0060
佳能c2020售后技术论坛 沈敲萄 2018/9/4 20:38:14 Code E000020-0060
Description ATR patch failed to be created correctly or Patch Sensor error
High density for the target at patch detection
Remedy
1. Check the patch shape.
2. Clean the high voltage contact point with dry wiping or air blower.
3. Check the harness/connector between the DC Controller (UN09) and the High Voltage PCB. Between the DC Controller PCB (UN09/ J21) and the Primary Charging High Voltage PCB (UN06/ J441, J442) Between the DC Controller PCB (UN09/ J21, J22) and the Developing High Voltage PCB (UN07/ J451, J452) Between the DC Controller PCB (UN09/ J19) and the Auxiliary High Voltage PCB (UN08/J461, J462) Between the DC Controller PCB (J205) and the Primary Transfer High Voltage PCB (UN04/J1001)
4. Replace the Drum Unit (Y)
5. Replace the Registration Patch Sensor Unit
6. Replace the ITB Unit.
7. Check conduction of the fuses (FU5, FU8) in the DC Controller PCB (UN09).
8. Replace the Primary Transfer High Voltage PCB (UN04)
9. Replace the Developing High Voltage PCB (UN07)
10. Replace the Primary Charging High Voltage PCB (UN06)
11. Replace the Auxiliary High Voltage PCB (UN08)
12. Replace the DC Controller PCB (UN09)
佳能c2020售后技术论坛 沈敲萄 2018/9/4 20:38:14 Code E000020-0060 Description ATR patch failed to be created correctly or Patch Sensor error
High density for the target at patch detection
Remedy
1. Check the patch shape.
2. Clean the high voltage contact point with dry wiping or air blower.
3. Check the harness/connector between the DC Controller (UN09) and the High Voltage PCB. Between the DC Controller PCB (UN09/ J21) and the Primary Charging High Voltage PCB (UN06/ J441, J442) Between the DC Controller PCB (UN09/ J21, J22) and the Developing High Voltage PCB (UN07/ J451, J452) Between the DC Controller PCB (UN09/ J19) and the Auxiliary High Voltage PCB (UN08/J461, J462) Between the DC Controller PCB (J205) and the Primary Transfer High Voltage PCB (UN04/J1001)
4. Replace the Drum Unit (Y)
5. Replace the Registration Patch Sensor Unit
6. Replace the ITB Unit.
7. Check conduction of the fuses (FU5, FU8) in the DC Controller PCB (UN09).
8. Replace the Primary Transfer High Voltage PCB (UN04)
9. Replace the Developing High Voltage PCB (UN07)
10. Replace the Primary Charging High Voltage PCB (UN06)
11. Replace the Auxiliary High Voltage PCB (UN08)
12. Replace the DC Controller PCB (UN09)
热门图文