佳能c2020出现E000074-0000怎么回事
更新时间:2025/5/13 14:38:24,view:630苏州佳能2020打印机售后服务中心客服热线69616769,苏州佳能打印机售后维修电话,佳能打印机售后网点,佳能2020 C报E000001-0004是什么问题, 双面打印怎么设置, 报e002, C错误代码E000020-03B0, C输稿器卡纸, IR复印报更改纸张尺寸啥问题, ir提示更改纸张尺寸, CE0000090000, 打印机插入废粉收集容器, S更换新墨盒还是墨粉不足, C登录系统管理员识别码, 打印机测试页, 打印机检测不到纸张, 启动进不了操做面如何恢复出厂设置, 错误E002,2020维修视频2025/5/13
E000074 (转印单元控制错误)
Description
Error in the primary transfer disengagement control
At the primary transfer disengagement control, the sensor fails to detect although the specified time has passed.
Remedy
Error in the Primary Transfer Disengagement Solenoid, Error in the Primary Transfer Disengagement Switch, or the ITB Guide Rail error
1. Replace the ITB Unit
2. Check the harness/connector between the DC Controller PCB (UN09/J11) and the Primary Transfer Disengagement Switch (SW01)
3. Check the harness/connector between the DC Controller PCB (UN09/J11) and the Primary Transfer Disengagement Solenoid (SL01)
4. Check conduction of FU6 on the DC Controller PCB (UN09)
5. Replace the ITB Guide Rail
6. Replace the Main Drive
7. Replace the Fixing Drive
8. Replace the DC Controller PCB (UN09)佳能c2020出现E000074-0000怎么回事
佳能c2020usb无法识别 cy_pro 2021/3/15 转印异常
Description
Error in the primary transfer disengagement control
At the primary transfer disengagement control, the sensor fails to detect although the specified time has passed.
Remedy
Error in the Primary Transfer Disengagement Solenoid, Error in the Primary Transfer Disengagement Switch, or the ITB Guide Rail error
1. Replace the ITB Unit
2. Check the harness/connector between the DC Controller PCB (UN09/J11) and the Primary Transfer Disengagement Switch (SW01)
3. Check the harness/connector between the DC Controller PCB (UN09/J11) and the Primary Transfer Disengagement Solenoid (SL01)
4. Check conduction of FU6 on the DC Controller PCB (UN09)
5. Replace the ITB Guide Rail
6. Replace the Main Drive
7. Replace the Fixing Drive
8. Replace the DC Controller PCB (UN09)佳能c2020出现E000074-0000怎么回事

热门图文